Book 3 — Specific Contracts

Section 601

Statutory text (Thai original)

ท่านห้ามมิให้ฟ้องผู้รับจ้างเมื่อพ้นปีหนึ่งนับแต่วันการชำรุดบกพร่องได้ปรากฏขึ้น

Verbatim from the Royal Gazette / Office of the Council of State

คำแปลภาษาอังกฤษ

No action against the contractor can be entered later than one year after the defect appeared.

This English translation is provided for reference only and has not yet been firm-verified — always rely on the Thai original.

Firm annotation

Section 601 is part of Book 3 (Specific Contracts) of the Thai Civil and Commercial Code. This entry is awaiting firm-authored commentary; the statutory text above is verbatim from the Office of the Council of State (OCS Krisdika) Thai source, with the English translation from the FAO/UN FAOLEX repository. Always rely on the Thai original for legal proceedings.

This is educational reference, not legal advice. Consult a qualified Thai lawyer before relying on any provision.

เริ่มดำเนินคดีของคุณ
Scroll to Top